Hillsdale College made the decision to work with Kiefer USA and Mondo to build a brand-new Mondo track at Hayden Park, which was completed in April 2024.
The new 200-meter, six-lane oval banked track with a 12-degree bank and a 21-meter radius at Mizzou will feature Mondo's Super X 720 surface. Kiefer USA is heading the team that will perform the track installation.